The largest installation executed by the Assyce Group to date.
This is the Assyce Group’s largest-scale installation project to date, an example of adaptation to the environment. Here we have used two of our own building patents which have optimised implementation and start-up times.
It was built in a record time of 4 months by a team of only 37 employees, thanks to effective coordination between a logistics base and stock on the ground.
The power installed is equivalent to the average consumption supply to 1,872 Spanish households.
41,300 linear metres of wire were used in the installation.
| Production | 5.9 MWp |
| Modules | First Solar |
| Field area | 17 Hectares |
| Construction time | 4 months |
| Emission reduction | 5457,31 Tm |